The last section of Gooburrum road that needed to be upgraded back in October was
ripped up, stabilised, re-laid, widened, and resealed. The bikeway has been incorporated into the road design and has been extended, widened, and sealed as well.
This completes all of the Gooburrum Rd and Tantitha Rd upgrades which work has been carried out in stages, over the last 18 months. The bikeway/walking path now connects and extends from Fairymead road along Tantitha road and Gooburrum road all the way to Gooburrum State School.
It looks great, is smooth to drive on and will provide a much safer environment for us all to use.
Comments